Valleyview Drive Camrose Drive Watermain Connection
Overview
The Water Master Plan study recommended that a 600mm water main would be required around the perimeter of the existing limits of the city to provide adequate supply and volume for fire protection for all existing and future areas of the City of Camrose.
The watermain installation project will involve the extension of a 600mm PVC pipe along Camrose Drive adjacent to the Valleyview subdivision development.
The proposed line will connect to existing watermains at either end of the Valleyview development.
The design and site supervision of this project will be conducted by the City of Camrose Engineering Department. For further information contact Engineering Services at 780-672-4428 or email.
Resources
Design Drawing
| Components of Project |
Schedule |
Contractor |
| Watermain Connection |
Fall 2009 |
Alfresco Contractors Inc. (Sherwood Park) |
| Budget and Funding |
| The total budget is $1,000,000 with funding from the City Land Reserve Fund. |