48 Avenue CNR Underpass (41 to 44 Street) Paving Overlay
Overview
Drainage and asphalt rutting issues have accelerated the surface deterioration necessitating a pavement overlay of this section of the road. Concrete curb and sidewalk will be repaired where required. As the construction start-up date draws closer a construction schedule will be available to the public.
The design and supervision of this project will be conducted by Engineering Services. For further information contact 780-672-4428 or email.
| Components of Project |
Schedule |
Contractor |
| Tendering Process |
July 2011 |
N/A |
| Asphalt Grinding |
August 2011 |
Border Paving ltd.
Camrose, Alberta
Phone: 780-672-3389 |
| Concrete Repair |
August 2011 |
Jo's Concrete Services Ltd.
Wetaskiwin, Alberta
Phone: 780-361-1180 |
| Paving Overlay |
September 2011 |
Border Paving ltd.
Camrose, Alberta
Phone: 780-672-3389 |
| Budget and Funding |
| The total proposed budget for this project is $135,000. The funding is $45,000 from Current Revenue and $90,000 from a Basic Capital Grant. |
|
|